Richmond, MA · Berkshire County

Richmond, MA Contractors: HVAC, Roofing, Plumbing & More

Berkshire County · pop. 1,435. Pick a trade below to see contractors serving Richmond.

Updated

Ready to schedule?

Book an in-home estimate in Richmond online. Pick the kind of work to see the times.

See times

Skip the phone calls

Describe your project once, and local contractors who want the job contact you directly. You choose how many.

Find local contractors

About hiring in Richmond

From our HVAC in Richmond page; each trade page has its own permit and cost notes.

Richmond at a glance

Richmond is a central Berkshire town of about 1,435 people in roughly 856 housing units, set in the rolling country between Pittsfield and West Stockbridge. The median home age is around 60 years, with the mix running from 19th-century farmhouses along Swamp Road and Lenox Branch Road to mid-century homes near Richmond Pond and a steady share of newer builds and second homes.

There's no natural gas service in town. Oil, propane, and wood dominate existing heating. The Pittsfield contractor base keeps drive time short, and Richmond Pond seasonal homes drive a meaningful share of conversion work.

Mass Save in Richmond

Richmond is in Eversource electric territory and fully Mass Save eligible. Whole-home cold-climate heat pump installs have typically qualified for up to $8,500 ($2,650 per ton) in recent rebate cycles; partial and single-zone mini-split installs usually land around $2,500–$6,000. A free Mass Save home energy assessment is the unlock for the larger rebates. For Richmond Pond seasonal homes converting to year-round use, the assessment is essential — insulation and air-sealing typically have to come first for a heat pump to keep up at design temperature. The 0% HEAT Loan up to $25,000 (effective January 1, 2025) is the standard finance vehicle.

Permits in Richmond

Massachusetts state code (780 CMR) requires a building permit for HVAC replacement, pulled through the Richmond building department. A separate electrical permit is required for new heat-pump circuits. Richmond Pond and adjacent wetlands mean Conservation Commission review under the Wetlands Protection Act is common for lakefront equipment work inside the 100-foot buffer. Plan for an extra few weeks if your project touches that buffer.

Building permits for work in Richmond go through the Richmond Building Department; see the Richmond Building Department’s contact, portal and who pulls the permit on permits.llc.